Stage folder rules drift between card and spec
Owner: Ivan Hawkes
references: p2-us-kanban-grid-view | p2-us-kanban-personal-view

Kanban Stage Folder Spec Drift

content/specification/technical/index.md no longer describes the stage folders that exist on disk.

Kanban Stage Folder Spec Drift

The specification listed the stages as 01-to-do, 02-in-progress (with the topic sub-folders design, features, ui) and 03-done. The board gained a 00-epics folder when the epics moved out of the stage system, the grid view depends on the folder layout, and the priority range in the specification was narrower than the range kan accepts.

Resolutions

Acceptance Criteria